Madrid colocation data center

Madrid

MAD-2 data center

Purpose-built 10MW facility on Madrid's 79MW hyperscale campus – Premier infrastructure with Barcelona-Madrid fiber backbone access

Get Your Quote

Iron Mountain Madrid MAD-2 data center

MAD-2 is a purpose-built 6.900 square meter, 10MW data center facility on Iron Mountain's 60.000 square meter Madrid campus, scheduled for completion in 2026. Featuring two 5MW halls designed for enterprise and hyperscale data center deployments, MAD-2 delivers the flexibility and power density that cloud providers and large enterprises demand. Located just 10 minutes from Barajas International Airport and positioned on the Barcelona-Madrid fiber backbone, MAD-2 combines strategic connectivity with sustainable operations powered by matched renewable energy. As part of the campus's phased 79MW expansion, MAD-2 represents the next generation of colocation infrastructure in the Spain data center market.

  • 10 MW
    Total IT capacity
  • Tier III
    Design
  • 2027
    Completion date
  • 79 MW
    Campus capacity

Why leading enterprises and AI providers choose our Madrid data center (MAD-2)

MAD-2 data center overviewCarrier neutral background

  • Total IT Capacity: 10MW at MAD-2, part of a 20MW building
  • Total Space: 6.900 square meters across 2 stories
  • Hall Configuration: Two 5MW halls designed for hyperscale deployments
  • Design: Flexible designs supporting diverse power requirements
  • Completion Date: Ready for services expected in early 2027
  • Infrastructure: Designed to Tier III standards with high availability
  • Energy: 100% matched renewable power and Green Power Pass offering
  • Campus: Part of 60.000 square meter Madrid campus with 79MW total capacity
  • Power Distribution: Redundant feeds, ID-E Sub fed 3 x RMU
  • Utility: Dual-feed configuration with N+1 block redundancy
  • Deployment Options: Hyperscale suites, dedicated halls, custom cages
  • Cooling: High-efficiency systems supporting high-density deployments
  • Security: 24/7/365 on-site monitoring and professional staffing across campus
  • Multi-factor authentication for facility and data center floor access
  • 24/7/365 Smart Hands services with rapid response SLA
  • Professional migration and deployment services
  • Customer offices and meeting facilities available on campus
  • Secure parking for customers and visitors
  • Professional reception with seating and refreshments
  • Loading facilities supporting equipment delivery from box trucks to 53-foot trailers
  • Secure equipment storage areas
  • Comprehensive video surveillance throughout campus
  • Break room facilities
  • Campus Location: San Fernando de Henares campus, northeast Madrid
  • Service area: Madrid, Barcelona, Spain, Iberian Peninsula, EMEA region and beyond
  • Airport: 10 minutes from Madrid-Barajas International Airport
  • Positioned on main Barcelona-Madrid fiber backbone
  • Shared building with MAD-3 (expected completion in 2027)
  • Road Access: Excellent access via A-2 highway and M-50 ring road
  • Metro Access: Easy access to Madrid city center and major business districts
  • Regional Connectivity: Direct fiber routes to Barcelona and throughout Iberian Peninsula
  • Address: San Fernando de Henares, Madrid, Spain
Campus Network Infrastructure
  • Carrier-Neutral: Full access to campus carrier ecosystem
  • Major Carriers: Vodafone, Telefónica, Orange, MásMóvil, Colt on campus
  • Dark Fiber: Lyntia and Correos Telecom available
  • Strategic Position: Barcelona-Madrid fiber backbone access
  • Cloud Providers: Connectivity to all major cloud platforms in Madrid availability zones
  • Cross-Campus: Direct connectivity to MAD-1 and MAD-3 facilities
  • Internet Exchanges: Proximity to major European IXs
  • Submarine Cables: Campus connectivity to Marea, EllaLink, Orval, 2Africa cable systems
Network Services Available
  • Cross Connects: Secure connections throughout the campus ecosystem
  • Cloud On-Ramps: Low-latency connections to major cloud providers
  • Metro Wave: Dedicated optical connectivity options
  • Direct Internet Access/IP Transit: BGP-capable redundant internet connectivity, Multiple upstream provider options
  • Virtual Cross Connects/Private Network Transport: Point-to-point L2 connectivity available between our data centers
Infrastructure & Operations
  • SOC 2 Type II: Independent attestation of security and availability controls
  • ENS Alta (Esqeuma nacional de seguridad)
ISO Certifications
  • ISO 27001: Information security management systems
  • ISO 50001: Energy management systems
  • ISO 14001: Environmental management systems
  • ISO 9001: Quality management systems
  • ISO 22301: Business continuity management
Industry Standards
  • HITRUST
  • PCI-DSS certification for the payment card industry data security

Want to learn more? Contact a data center team member today!

 
nje enterprise customers

Join 1,300+ global customers

Iron Mountain Data Centers is trusted by 95% of the Fortune 1000 to protect, connect, and activate their most valuable data. Our customers include leading enterprises, government agencies, financial services firms, healthcare organizations, and technology companies that demand the highest standards in security, compliance, and performance. With over 30 years of colocation excellence and a global footprint spanning 30+ locations across three continents, we deliver sustainable, carrier-neutral infrastructure solutions that support long-term digital transformation.

Become a Customer Today

Ready to experience the MAD-2 advantage?

Immediate next steps

Frequently asked questions

What makes MAD-2 unique compared to other facilities?

MAD-2 is purpose-built for hyperscale deployments with two 5MW halls engineered for high-density requirements. Scheduled for completion in early 2027, MAD-2 shares a building MAD-2 shares a building with MAD-3, enabling seamless cross-facility connectivity and operational efficiencies within a single infrastructure footprint. This co-location provides pre-construction pricing advantages and design flexibility that existing facilities cannot match. As part of Iron Mountain's 79MW Madrid campus, MAD-2 customers benefit from the operational connectivity ecosystem already established at MAD-1 while gaining access to next-generation infrastructure designed specifically for cloud providers and large enterprise deployments.

What other facilities are available on the Madrid campus?

The Madrid campus spans 60.000 square meters with a total planned capacity of 79MW. MAD-1 (3MW) is currently operational with MAD-2 (10MW) delivering in early 2027, followed by followed by MAD-3 (10MW) in 2027. For colocation in Spain, the campus master plan includes eight total facilities through 2029, providing significant growth runway and cross-campus connectivity options for distributed architectures and disaster recovery configurations.

How many megawatts and square meters is MAD-2?

The 6.900 square meter MAD-2 delivers 10MW of total IT capacity organized into flexible 5MW halls. This configuration supports hyperscale deployments requiring entire halls as well as smaller enterprises needing dedicated cages or colocation cabinets. Our data center in Spain is part of the 60.000 square meter campus and features purpose-built infrastructure with optimized data hall layouts designed for efficiency and scalability.

What security and compliance measures are in place at MAD-2?

MAD-2 will maintain Iron Mountain's comprehensive compliance program with the following certifications and standards on the roadmap: SOC 2 Type II and complete ISO certification suite (27001, 50001, 14001, 9001, 22301, 14064). The facility features 24/7/365 on-site security monitoring, multi-factor authentication for data center access, comprehensive video surveillance, and campus-wide security protocols. As the only global provider to simultaneously comply with ISO 27001, 50001, 14001, and 9001 across all locations, MAD-2 will deliver the same industry-leading security and compliance standards that distinguish Iron Mountain worldwide.

Is MAD-2 suitable for hyperscale deployments?

Yes, MAD-2 is engineered explicitly for hyperscale requirements. The 5MW data hall configurations provide the power density, cooling capacity, and infrastructure flexibility that hyperscale cloud providers demand. The Tier III-compliant design supports high-density deployments with N+1 redundancy, while the 2027 delivery time enables infrastructure planning and pre-construction customization to meet specific deployment requirements.

What is the timeline for MAD-2 completion and move-in?

MAD-2 is scheduled for completion in early 2027, with customer move-ins beginning shortly thereafter. Pre-construction contracting is available now, offering pricing advantages and design input opportunities. The phased campus development approach means power, cooling, and connectivity infrastructure are already secured, reducing delivery risk. Early commitments enable infrastructure customization to meet specific deployment requirements before construction completion.

Contact us