Iron Mountain Data Centers Northern Virginia VA-1 data center

Northern Virginia

VA-1 data center

Secure, sustainable colocation in the heart of data center alley – Federal-ready infrastructure with Prince William County advantages

Get Your Quote

Iron Mountain Manassas VA-1 data center

Situated on a 142-acre, highly secure Northern Virginia data center campus, VA-1 is the first facility on a master-planned campus that will ultimately deliver over 2 million square feet of sustainable and compliant colocation space across 10+ data centers. VA-1 offers 168,000 gross square feet and 12.4 MW of 100% matched renewable power in Prince William County—delivering the connectivity and compliance of Ashburn colocation with superior cost efficiency. VA-1 provides exceptional energy efficiency and an extensive, fast-growing ecosystem of cloud, network, and service providers. Whether you need colocation cabinets, dedicated cages, or custom deployments, VA-1 delivers the space, security, standards, and power configurations your mission-critical infrastructure demands.

  • 168,000
    Square feet
  • 12.4 MW
    of renewable power capacity
  • 142-acre
    Highly secure campus
  • 20+
    Carriers on-site

Why leading enterprises choose our Northern Virginia data center (VA-1)

VA-1 data center overviewCarrier neutral background

  • Size: 167,959 square feet on a 142-acre secure campus
  • Power: 12.4 MW total capacity
  • Infrastructure Redundancy: Block N+1 configuration and Tier III design for maximum uptime
  • Efficiency: Exceptional energy efficiency with low design PUE
  • Energy: 100% matched renewable power and Green Power Pass offering
  • Deployment Options: Colocation cabinets, data center suites, dedicated cages, and custom build-outs
  • Power Configurations: Standard to high-density options available
  • Data Halls: Single-story building with six 11,000 square foot halls with a traditional raised floor
  • Cooling: High-efficiency cooling systems with N+1 block redundancy
  • Power Distribution: A/B underground utility feeds
  • Utility: NOVEC (Northern Virginia Electric Cooperative)
  • Campus Master Plan: First of multiple planned data centers totaling 2+ million square feet and 400+ MW capacity
  • Security: 24/7/365 on-site monitoring with federal-grade campus security and IMDC staffing
  • Three-factor authentication (badge + pin + biometrics) for data center floor access
  • Two-factor access (badge + pin) to enter facility
  • Security vestibule passage before data center entry
  • 24/7/365 Smart Hands services with 30-minute acknowledgment SLA
  • Professional migration services and cross connect installations
  • Customer conference rooms, offices and break room facilities
  • Ample secure parking for customers and visitors
  • Professional lobby with seating and refreshments
  • Guest Wi-Fi and shared work areas
  • Industrial loading docks with 24/7 availability that can service from small box trucks to 53-foot tractor-trailers
  • Secure temporary storage for equipment
  • Comprehensive video surveillance throughout campus
  • Service area: Northern Virginia, Washington D.C. metro area, and beyond
  • Distance: Minutes from the Ashburn Data Center Alley and Washington, D.C.
  • Airport: 28 miles from Washington Dulles International Airport (IAD)
  • Positioned in the heart of the world's largest data center and network hub
  • Low latency connectivity: ~1ms to NYC metro, ~35ms to Atlanta
  • Carrier Hotels: 21721 Filigree Ct, Ashburn | 12100 Sunrise Valley Dr, Reston
  • Prince William County location offering better tax incentives than Ashburn
  • Lower power costs compared to the Ashburn market
  • Easy access to Manassas, Reston, Sterling and the greater Washington DC metropolitan area
  • Location: Prince William County, 5 miles from I-66
  • Address: 11680 Hayden Rd, Manassas, VA 20109
Network Infrastructure
  • Diverse Entry Points: Multiple diverse fiber points of entry with diverse routing paths
  • Cloud Connectivity: Access to AWS Direct Connect, Azure ExpressRoute, and Google Cloud Interconnect
  • Carrier-Neutral Facility: 20+ on-site network providers, including AT&T, Cogent, Cox Communications, Crown Castle Fiber, GTT Communications, Hurricane Electric, Tata Communications, Arelion
  • Fiber Providers: DF&I, Lumen, Comcast, FiberLight, Lumos, SummitIG, Utelisys, Zayo Group
  • Internet Exchange: LINX (London Internet Exchange) for enhanced peering options
  • Metro Access: Direct connectivity to Megaport® for enhanced interconnection options
  • Strategic Location: Positioned in the heart of the world's largest data center and network hub
  • Metro Connectivity: Direct metro access to Ashburn and Reston interconnection points
  • WAN Connectivity Options available
Network Services
  • Cross Connects: Secure campus-wide connections to ecosystem of carriers, partners, and customers in multiple IMDC Meet-Me-Rooms
  • Direct Internet Access/IP Transit: Redundant paths to multiple upstream providers, including Arelion, Lumen & Zayo, with burstable service supporting BGP and TCP/IP v4 or v6
  • Cloud On-Ramps: Low-latency connections to major cloud providers, including AWS, Azure, and Google Cloud, with SDN providers such as Megaport®
  • Metro Wave: Dedicated, diverse optical 10 and 100 Gbps waves to strategic interconnection points in Ashburn and Reston
  • Virtual Cross Connects/Private Network Transport: Point-to-point L2 connectivity available between our data centers, leveraging Iron Mountain's network backbone for campus, metro, national, and international connectivity
Federal & Government Certifications
  • NIST 800-53: Compliance with federal security controls framework
  • FISMA HIGH: Federal risk management framework certification for high-impact systems
  • FedRAMP Ready: Cloud service authorization for government agencies
Other Regulated Industries
  • PCI-DSS: Payment card industry data security standard compliance
  • HIPAA: Healthcare data protection and privacy compliance
Infrastructure & Operations
  • SOC 2 Type II: Independent attestation of security and availability controls
  • SOC 3: General use security reporting for stakeholder transparency
  • ANSI/TIA-942 facility standards
ISO Certifications
  • ISO 27001: Information security management systems
  • ISO 50001: Energy management systems
  • ISO 14001: Environmental management systems
  • ISO 9001: Quality management systems
  • ISO 22301: Business continuity management
  • ISO 14064: Greenhouse gas accounting and verification
Environmental & Energy
  • EPA Energy Star certified for energy efficiency

Want to learn more? Contact a data center team member today!

 
nje enterprise customers

Join 1,300+ global customers

Iron Mountain Data Centers is trusted by 95% of the Fortune 1000 to protect, connect, and activate their most valuable data. Our customers include leading enterprises, government agencies, financial services firms, healthcare organizations, and technology companies that demand the highest standards in security, compliance, and performance. With over 30 years of colocation excellence and a global footprint spanning 30+ locations across three continents, we deliver sustainable, carrier-neutral infrastructure solutions that support long-term digital transformation.

Become a Customer Today

Ready to experience the VA-1 advantage?

Immediate next steps

Frequently asked questions

What makes VA-1 unique compared to other Northern Virginia data centers?

VA-1 colocation combines the best of both worlds: all the connectivity and ecosystem access of Ashburn's Data Center Alley with the cost advantages of Prince William County, including lower power rates and better tax incentives. Our 142-acre campus offers room for growth with multiple planned data centers totaling over 2 million square feet, and we're powered by 100% renewable energy with comprehensive federal-grade compliance certifications.

What compliance certifications does VA-1 maintain?

Iron Mountain Data Centers VA-1 maintains the most comprehensive compliance program in the colocation industry, including NIST 800-53, FISMA HIGH, FedRAMP, SOC 2 Type II, SOC 3, PCI-DSS, HIPAA, TIA-942, and multiple ISO certifications (27001, 50001, 14001, 9001, 22301, 14064). This makes VA-1 ideal for government agencies, healthcare organizations, financial services, and other highly regulated industries.

How many carriers and cloud providers are available at VA-1?

VA-1 features 20+ carriers on-site, including major providers like AT&T, Cogent, Crown Castle, Hurricane Electric, and Zayo Group, plus fiber from Lumen, Comcast, and others. We offer direct cloud on-ramps via Megaport®, with metro connectivity to AWS, Azure, Google Cloud, and all major cloud service providers. Our carrier and cloud-neutral approach gives you complete flexibility.

What are the power and space specifications for VA-1?

VA-1 offers 168,000 square feet and 12.4 MW of power capacity, all from 100% renewable energy sources. Our high-efficiency design achieves optimal low PUE, better than industry averages. Through our Green Power Pass program, customers can report carbon reductions to CDP and other frameworks using audit-ready data. We're also an EPA Green Power Partner (#10 in tech/telecom) and participate in the US DoE Better Buildings Challenge.

What other Iron Mountain data centers are in Northern Virginia?

VA-1 is the first facility on our 142-acre Prince William County campus, with seven operational facilities and plans for multiple additional data centers that will collectively provide over 2 million square feet and 400+ MW of total capacity. This master-planned campus allows for significant growth and expansion opportunities. Iron Mountain also offers additional Virginia colocation at our Richmond campus.

What types of colocation space are available at VA-1?

VA-1 offers flexible deployment options, including individual colocation cabinets, dedicated cages on traditional raised floors, and custom buildouts for larger deployments. We can accommodate everything from a few critical cabinets to multi-megawatt hyperscale deployments, with power configurations ranging from standard density to high-density options. All six data halls feature 11,000 square feet of space with Block N+1 redundancy.

Contact us